Construction of Track-and-Field Arena and Stadium at 2 Jana Dalina Street, Valmiera

Execution time: 29 April 2018 until March 2020
Customer: Limited Liability Company “YIT Infra Latvija”

Within the framework of the project, there is planned the reconstruction of the existing stadium, construction of new track-and-field arena and hotel (total area 12,367 m2) as well as the environmental improvement.

It is planned to rebuild the stadium, keeping the sprint straight in its current location while changing the external configuration of 400-metre runway. Eight lanes are provided for the run track along the perimeter and nine lanes in the straight. Soccer field with a natural lawn meeting the FIFA (International Federation of Soccer Federations) rules will be built. Shotput, high jump, hammer throw, discus and javelin throw sectors will be arranged at the ends of the football field, as well as a pit of water obstacles. Comfortable locker rooms for athletes, coaches and judges, equipment warehouses and technical premises, fitness hall and café will be located in the stands area of the stadium.

A 200-meter run track ring with four lanes and curves will be constructed in the track-and-field arena according to the technical requirements of IAAF (International Association of Athletics Federations). It will accommodate eight 60 m sprint lanes, long jump, triple jump, high jump, pole vault and shotput sectors as well facilities for javelin and hammer throw. Viewing stands provide places for 1,250 spectators.

Within the framework of the contract, we will carry out works on the construction of indoor and outdoor water and drainage systems, ventilation and conditioning systems, heating system, underfloor heating, drainage systems, air curtains, ceiling heating, boiler rooms, building structures, roof, ceiling and facade.